Run your numbers
How the math works
Jobs lost per week are your missed calls per week, times the share that would have booked. Revenue lost per week is those jobs, times your average job value.
- Per week: missed calls, times the share of callers who would book, times job value.
- Per month: the weekly number, times 52, divided by 12.
- Per year: the weekly number, times 52.
With the example numbers, 10 missed calls a week and half that would book gives 5 jobs. At $500 a job, that is $2,500 a week, $10,833 a month and $130,000 over 52 weeks. It is revenue before labor, parts and other costs.
An empty box counts as zero. The percent stops at 100.
What to do with the number
Use your call log for missed calls and your booking records for the share. Use what a typical job is worth to you. If you do not have records yet, treat the result as a scenario, not a fact.
- Read what missed calls really cost a service business for the full picture.
- See how a missed call text back reaches the caller first.
- Check how fast to reply to leads.
- Or book a call and we will go through your numbers together.
SvarKlar is $295 a month, setup is free, and you can cancel any time.
More guides like this are collected in SvarKlar Resources.